Results from newest to oldest: 45

Customer story
A hydroelectric project on Virginia’s New River was built in 1939. It produces 75MW of electricity that provides power to approximately 60,000 homes…
A technician inspects the overhead crane.
Article
Casey Storer A limit switch is a critical component of overhead crane safety. Limit switches are electromechanical devices that regulate everything…
Konecranes hoist.
Article
Josh Childers - Konecranes Training Manager When you park your car on a steep hill and apply the parking break, your car should not move. However,…
Konecranes expert and customer discuss inspections
Article
Michael Hancock - District Technical Trainer A program of regularly-scheduled crane inspections conducted by specially-trained, third-party…
The technician repairs the overhead crane.
Article
Calvin Leclair - New Business Development One of the most expensive parts of crane repair is not the cost of the actual repair. It is the loss…
Konecranes technician working on a crane
Customer story
Markin Tubing operates eight steel tube mills, offering a complete range of small diameter plain, copper flash and Galfan® coated as-welded carbon-…
Konecranes technician.
Article
The daily work life of a Konecranes crane technician calls for a wide range of skills and qualities, both technical and otherwise, which can…
Konecranes expert operates crane.
Article
David Dolph – Service Supervisor and Crane Operator Trainer  As a trainer of crane operators, I have encountered few crane operators who talk…
Konecranes hoist
Article
James Lang – General Manager, Konecranes Training Institute  Today’s pressure to achieve ever-increasing productivity leads to ever-expanding…